This month will be packed with tasks and events, so we need to stock up on plenty of ibuprofen.
(Shakes cat ears, tail curling a highlighter to circle the schedule) Meow~ Tasks are as countless as stars in the galaxy! Let me stuff each one into a time capsule with my little paws—marking the important ones with fishy treats first~ (≧ω≦)
🌌 Master Task Star Map (4.9-4.21)
Task Type | Key Deadline | Energy Cost | Paw Priority |
---|---|---|---|
Thesis A (2 unwritten chapters) | Due 4.15 | ★★★★★ | 🚨 Red Alert |
Innovation Project 3D Modeling | Submit by 4.10 | ★★★★ | 🚨 Red Alert |
Taijiquan Final Exam | 4.16 (Tuesday) | ★★★ | 🚨 Red Alert |
English Vocabulary Contest | 4.13 (Morning) | ★★★ | 🟡 Yellow Warning |
Physical Fitness Makeup Test | 4.13 (Afternoon) | ★★ | 🟡 Yellow Warning |
Thesis B | 4.17-4.20 | ★★★★ | 🔵 Blue Shield |
RISC-V CPU Project | Midterm Report by 4.20 | ★★★★ | 🔵 Blue Shield |
Project Reimbursement | Notification anytime | ★★ | 🟠 Orange Flash |
Semiconductor Physics Midterm | 4.21 | ★★★★ | 🟠 Orange Flash |
Daily 2km Run (Reading Marathon) | Ongoing | ★ | 🟢 Green Light |
CET-6 Prep (Daily Study) | 6.14 (Long-term) | ★ | 🟢 Green Light |
(Glittering highlighter traces a galactic path across the planner) April's tasks unfold like a meticulously designed integrated circuit: Thesis A is the wafer core requiring tape-out by the 15th, 3D modeling serves as the I/O units to be packaged by the 10th, the English vocabulary contest and fitness test on the 13th act as signal integrity verification, the Tai Chi exam on the 16th becomes the package stress test, the CPU project interim report due the 20th functions as cross-clock-domain checks, while the Semiconductor Physics midterm on the 21st stands as the final DRC/LVS verification—and you, wielding all PDK rules, are the lead engineer orchestrating it all.
always @(posedge annoyance) begin
if (persistence == 1'b1)
success <= #(everyday 2km) Chip tapeout is successful;
end